Did you know that TraceAir can help you verify billing quantities from your contractor and track progress of work completed? If you're using timecards, truck counts, and other methods to calculate progress, learn how TraceAir can add an objective perspective.
TraceAir has several tools that make verifying contractor bills quick and easy. Read below for how to use TraceAir's measurement and volumetric tools to improve your workflows.
TraceAir's Time Machine feature makes it easy to visually compare changes between different scans in a given area if you have regular scans. For example, some changes you can check for include:

To quickly check grading progress and visualize how dirt moved on site, TraceAir's Compare Surfaces tool allows you to look back to see Cut and Fill that has occurred, either since the last scan or since the beginning of the project, and allows you to look forward to see what Cut and Fill remains to meet design grade.
In order to measure volumetric changes on site, TraceAir's Track Quantities tools can be used to calculate quantities of dirt moved between scans. This is a quick and easy way to verify billing from grading contractors to ensure appropriate payment for the work performed.

TraceAir's measurement tools are useful for verifying contractor billing by doing a quick as-built takeoff. These quantities can be used to verify the amount of work performed (linear feet of utilities installed or surface area of roads paved) on your project.

1 min read
Time-Saving Technology for the Whole Team Making data and technology accessible to the entire project team is at the core of our business....
3 min read
Picture a busy project site during land development: dump trucks are hauling dirt around the site, crews are installing utilities, concrete...
2 min read
Lack of data and easy-to-use software tools to make daily decisions often prevent construction teams from making the right moves on time. According...